Beringer CM-E73X Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Projecteurs Beringer CM-E73X. Beringer CM-E73X User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
INSTALLATION INSTRUCTIONS
Model: CM-E73X
Compatible Models: Optoma EP731/732/732H/737/738/739/H30
READ THIS BEFORE YOU START
X Maximum weight limit is 20 pounds (9.1 kg).
Do not exceed this limit.
X Always use caution and care when working with
heavy projectors.
DO NOT TAKE UNNECESSARY RISKS!
X Once you have chosen a location for the mount,
determine the construction of the ceiling.
Solid wood surface: a beam, or a wood joist
inside the wallboard.
Wallboard: sheet rock, plasterboard or
paneling.
Masonry: plaster, cement or brick.
X It is recommended that the ceiling mount be
mounted to a ceiling beam or wood joist.
X CAUTION: Use only the supplied TOGGLER®
TC® drywall/plasterboard anchors to support the
ceiling mount screws. Use them as anchors to
fasten the ceiling mount to sheet rock, plaster
board or paneling. Use the TOGGLER® Alligator®
anchor for solid wood or masonry. (See enclosed
TOGGLER® Anchoring Solutions brochure.)
X Before installing the ceiling mount, make sure the
mounting location is sturdy enough to support the
projector.
If you are not sure that your location will
hold the projector’s weight, contact a professional
contractor for advice.
X Recommend maximum extension; do not exceed
15 inches if the base join is angled.
TOOLS REQUIRED
Hex wrench (included).
Phillips screwdriver
Drill with a 5/16” bit for the TC® anchors
Drill with a 1/4” bit for the AF6 Alligator® anchors.
Two crescent or 3/4" open-end wrenches.
__________________________________________________________________________
T.M.
Vue de la page 0
1 2

Résumé du contenu

Page 1 - INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Model: CM-E73X Compatible Models: Optoma EP731/732/732H/737/738/739/H30 READ THIS BEFORE YOU START X Maximum w

Page 2

X INSTALLING THE CEILING MOUNT 1. Select an appropriate projector mounting location and extension shafts (Part No. 9, 10, 11) needed, if any, to g

Commentaires sur ces manuels

Pas de commentaire